Shandong Heavy Industry Machinery Co.,Ltd.

Quality First,Service Best

Manufacturer from China
Site Member
3 Years
Home / Products / Generator Set /

CAMC Green Color Generator Set 270KW air-to-air cooling Original Quality Transportation Industry

Contact Now
Shandong Heavy Industry Machinery Co.,Ltd.
City:jinan
Country/Region:china
Contact Person:MrsSamantha
Contact Now

CAMC Green Color Generator Set 270KW air-to-air cooling Original Quality Transportation Industry

Ask Latest Price
Video Channel
Brand Name :CAMC
Model Number :CM6T28F.270 30
Certification :ISO9001
Place of Origin :CHINA
MOQ :1 Piece
Price :Negotiable
Payment Terms :T/T, Western Union, MoneyGram
Supply Ability :20 pcs per month
Delivery Time :WITHIN 7-10 DAYS AFTER RECEIPT OF 100% PAYMENT
Packaging Details :Neutral packing
Material :Metal
Quality :Original Quality
Payment :T/T
Transportation :by Sea/by Bulk/by Frame/Container
Market :Africa South America Southeast Asia Russia
Minimum temperature without auxiliary cold start :-15°C
Service hours :24
Color :Customizable
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

CAMC Green Color Generator Set 270KW Air-To-Air Cooling Original Quality Transportation Industry

Diesel generator sets have the following advantages:

1. Fuel economy, high thermal efficiency, when the working conditions change, the change of the fuel consumption rate curve is relatively flat, and it is also economical under low load.

2. Reliable and durable. Because there is no ignition system, the fault is low.

3. Wide range of use.

4. Lower harmful emissions.

5. Good fire safety.

Diesel generator set features:

1. There are many levels of stand-alone capacity. The unit ranges from several kilowatts to tens of thousands of kilowatts, and the largest domestic unit is several thousand kilowatts.

2. The supporting equipment is compact in structure and flexible in installation location (water cooling is only 1/10 of 34~82L/KWH steam turbine)

3. High thermal efficiency, low fuel consumption (thermal efficiency 30~46%)

4. Quick start, and can quickly reach full power It only takes a few seconds, and the full load can be reached within 1 minute in an emergency (normally 5~30MIN). The shutdown process is short and can be started and stopped frequently.

5. The maintenance operation is simple, the number of people is small, and the maintenance is easy during the standby period (6). The comprehensive cost of the construction and power generation of the diesel generator set is the lowest

Product Description

Machine data

Type

in-line, six-cylinder, four-valve, four-stroke

Intake method

Supercharging, air-to-air cooling

Bore X stroke

128mmX153mm

Displacement

11.81L

Compression ratio

12:1

Firing sequence

1-5-3-6-2-4

Cylinder distance

162mm

Combustion chamber type

ω type

Engine dimensions (length X width X height)

1360mmx812mmx1138mm

Engine weight (including flywheel, excluding generator)

1065kg

Moment of inertia of flywheel

2.9Kgm 2

Intake and exhaust system

Rated point exhaust back pressure

11KPa

Exhaust temperature

560°C

Exhaust flow

1250Kg/h

Intake flow

1200Kg/h

Allowable maximum intake resistance (clean filter element)

3.5KPa

Allowable maximum intake resistance (dirty filter element)

6.5KPa

Intake resistance alarm value

6.3KPa

cooling system

Coolant main content

50:50 (ethylene glycol: water)

Coolant outlet temperature

95°C

The temperature difference between the inlet and outlet of the coolant is

5.53°C

Radiator heat dissipation

107KW

Radiator flow rate

373L/min

Alarm temperature

104℃

Air intake type

air-to-air cooling

Allowable pressure drop of intercooler

11-13KPa

Intercooler heat dissipation

49KW

The allowable intake air temperature of the intercooler is

190°C

The maximum air intake of the intercooler is

1200Kg/h

lubrication system

Engine oil pressure@idle speed

210KPa

Engine oil pressure@rated point

500KPa

Maximum allowable oil temperature

130°C

Oil pan capacity low

30L

Oil pan capacity high

38L

Total system capacity

41.6L

Allowable inclination angle of oil pan @forward

30°

Allowable inclination angle of oil pan @backward tilt

30°

Allowable inclination angle of oil pan @ fuel pump side elevation angle

30°

Allowable inclination angle of oil pan @ exhaust side elevation angle

30°

Electric start system

Standard starter voltage

24V

Minimum average starting speed without auxiliary cold start

130r/min

Minimum temperature without auxiliary cold start

-15°C

Product Image

CAMC Green Color Generator Set 270KW air-to-air cooling Original Quality Transportation Industry

CAMC Green Color Generator Set 270KW air-to-air cooling Original Quality Transportation Industry

Other Products

CAMC Green Color Generator Set 270KW air-to-air cooling Original Quality Transportation Industry

CAMC Green Color Generator Set 270KW air-to-air cooling Original Quality Transportation Industry



Transportation And Storage


CAMC Green Color Generator Set 270KW air-to-air cooling Original Quality Transportation Industry

1. OEM Manufacturing welcome: Product, Package.


2. We will reply you for your inquiry in 24 hours.


3. After sending, we will track the products for you once every two days, until you get the products. When you got the
goods, test them, and give me a feedback. If you have any questions about the problem, contact with us, we will offer
the solve way for you.

Our Advantage

1. Either original or OEM parts, we have lots of directly suppliers to choose. You could get HOWO/SHACMAN/HONGYAN/FAW spare parts bellow market price.


2. “One-shop purchasing service”: Quotation--Preparation--Delivery. With 10+year experience, we proficient in parts business management process.


3. After getting your order, we will take pictures of every parts for you. Even if you have 500 items.


4. Has Sinotruk parts system, we can get the exact information according the chassis no and assembly nameplate , accurate rate reaches 95%.


5. Our boss is very familiar with the working principle and maintenance of trucks.

F&Q

Q1. What is your terms of packing?


A: Generally, we pack our goods in neutral white boxes and brown cartons. If you have legally registered patent,
we can pack the goods in your branded boxes after getting your authorization letters.

Q2. What is your terms of payment?


A: T/T 30% as deposit, and 70% before delivery. We will show you the photos of the products and packages
before you pay the balance.

Q3. What is your terms of delivery?


A: EXW, FOB, CFR, CIF.

Q4. How about your delivery time?


A: Generally, it will take 30 to 60 days after receiving your advance payment. The specific delivery time depends
on the items and the quantity of your order.


Inquiry Cart 0